•Earthwork in formation filling: 2004000.00 cum •Earthwork in formation cutting: 743000.00 cum •Major Bridge: 12 Nos. •Minor Bridge: 13 Nos. •ROBs/RUBs: 19 Nos
Construction of Dharakoh-Maramjhiri 3rd & 4th line
Construction of Dharakoh-Maramjhiri 3rd & 4th line Ch: KM 831.8 to KM 841.9, Central
Railway
Central Railway
Key Highlights
View Project Gallery
•Tunnels: 4 nos. of total length 1.6 km •Earthwork in formation filling: 659000.00 cum •Earthwork in formation cutting: 806000.00 cum •Important Bridge (Viaduct): 2 Nos. •Major Bridge: 1 No. •Minor Bridge: 25 Nos.
Construction of Budni-Barkheda 3rd Line
Rail Vikas Nigam Limited / West Central Railway
Key Highlights
View Project Gallery
•Tunnels: Lining 1200 m •Cut & Cover: 3 nos of total length 1104 m. •Underground excavation: 600000 cum •Major Bridge: 13 Nos. •Minor Bridges: 57 Nos. •Underpass: 5 nos. of 89 m -130 m length.
2 FOBs in connection to Samakhiyali-
Bhilidi Railway
Rail Vikas Nigam Limited / Western Railway
View Project Gallery
Construction of 6 FOBs in connection to Kota-Bina and 2 FOBs in connection to Samakhiyali-
Bhilidi Railway Doubling Project
Construction of Ahmedabad RVNL Office Building and Botad Western Railway Workshop
Holistic Techno Engineers
A-57, 3rd Floor, Block A, Sector 4, Noida
Our Mail
info@holistictechno.in
The idea of Holistic Technoengineers embodies the perspective that engineers must consider the entire system and the full scope of work for a project’s success. This new breed of Holistic engineers will not only be comprehensive problem solvers but also problem definers, leading multidisciplinary teams, setting agendas, and fostering innovation in construction and infrastructure development.